Song Lam Investment & Construction Co., Ltd. was established on May 05, 2003 by Mr. Nguyen Nhu Hung and founder members in accordance with Business Permit no.5500212361 dated May 05, 2003 which got revised ninthly on May 08, 2014 issued by Son La Department of Planning and Investment in accompany with an initial authorized capital of two billion dong and four personnels including a director, a chief accountant and 2 civil engineers. Since then, our authorized capital has expanded up to 322 billion dong along with a skilled personnel team of 235 employees of whom special staffs graduated from university: 35 making up 8.2%, from college: 80 equal to 18.8%, intermediate level: 100 equivalent to 23.5%, untrained employees: 20 as 4.7% and male labour makes up 85% while the rest of female is 15%, ethnic labour is approximately 20%. We have entered into a close cooperative relationship with both domestic and international partners in executing and putting into operation many construction projects including road priority projects in Son La province and road projects for the emigration-resetlement operation of Son La Hydropower Project as well as in investing in hydropower projects under the BOO form (Build-Own-Operate) to supply power for Mai Son Cement Plant which has a production capacity of 1 million tons per year, such as:
- Nam Chim 1 Hydropower project (2x8MW): started in June 2006 and put into operation in April 2010
- 110kV Substation for Mai Son Cement Plant: started inJune 2006 and operated in April 2010
- Nam Chim 1A Hydropower Project (2x5MW): initiated in August 2013 and put into operation in August 2015,
- Road constructions: Hua Ti - Cha May (11/2009 - 10/2011), Chieng An (01/2010 - 01/2012), Sop Cop - Lanh Banh Port (10/2010 - 05/2012), road construction complex of Noong Duc resetlement area (05/2011 - 01/2012), Ta Xua - Hang Dong (04/2009 - 12/2011), Highway no.6 - Mai Son Industrial Zone (11/2009 - 1/2010), Chieng Ngam - Huoi Phay (12/2006 - 10/2008), Tong Co - Bo Muoi (10/2005 - 04/2006), Huoi Pha (07/2008 - 11/2009), Highway no.6 - Me Ban (12/2006 - 06/2008), etc.
- Keo Bac Hydropower Project (2x900kW): completed in 2013.
- 110kV overhead line connecting Nam Chim 1&1A HPP complex with 110kV Substation for Mai Son cement plant (32 kms).
- Na Bo petrol station.
 
INFORMATION OF MEMBER BOARD
- Contributory Shares:
Mrs. NGUYEN NHU HOA Nationality: Vietnamese
ID no.013451926 issued on September 10, 2011 by Hanoi Department of Public Security
Resident add.: Room no.1003, 10th Floor, Building B, Dwelling and Office for rent Area CT3.7 NO, Nhan Chinh ward, Thanh Xuan district, Hanoi city, Vietnam.
Capital share: 22.5 billion dong (as 5.33%).
Mrs. HOANG THI HUONG Nationality: Vietnamese
ID no.050372462 issued on February 06, 2013 by Son La Department of Public Security
Resident add.: Unit no.9, Chieng Le ward, Son La city, Son La province, Vietnam.
Capital share: 79 billion dong (as 18.72%).
Mr. HOANG QUOC HANH Nationality: Vietnamese
ID no.050335272 issued on October 01, 2008 by Son La Department of Public Security
Resident add.: Unit no.7, Chieng Le ward, Son La city, Son La province, Vietnam.
Capital share: 17.5 billion dong (as 4.15%).
Mr. NGUYEN NHU HUNG  Nationality: Vietnamese
ID no.050341833 issued on March 22, 2006 by Son La Department of Public Security
Resident add.: Cach Mang thang 8 street, Unit no.9, Chieng Le ward, Son La city, Son La province, Vietnam.
Capital share: 303 billion dong (as 71.80%).

- Legal Representative: 
Mr. NGUYEN NHU HUNG
Title: Chairman - Director
Nationality: Vietnamese
ID no.050341833 issued on March 22, 2006 by Son La Department of Public Security
Resident add.: Cach Mang thang 8 street, Unit no.9, Chieng Le ward, Son La city, Son La province, Vietnam.
 
- AUTHORIZED CAPITAL: 422,000,000,000 vnd (In word: Four hundred and twenty two billion vietnam dong)